An install, start to finish
Soil and site evaluation
Someone qualified digs test holes or borings and records what the soil does. That result decides between a standard drain field and an aerobic or other alternative design.
Design and permit
The design shows tank size, field area, and setbacks from wells, property lines and water. It's submitted to Johnson County Development Services, which issues OSSF permits for the county as TCEQ's designated representative.
Installation
Tank set, lines laid, field built. A typical residential job takes a few days once the permit is in hand. Rain pushes it back.
Inspection and use
The county inspects before backfill. Aerobic systems also need an ongoing maintenance contract.
Questions to ask any installer
Their TCEQ installer registration number. Whether the quote includes the design and permit fee. How long the work is warrantied.